Grand Forks English Coulee Water Quality Improvement and Public Outreach
ENGLISH COULEE WATER IMPROVEMENT AND PUBLIC OUTREACH Grand Forks, North Dakota About the Project The English Coulee meanders through Grand Forks, North Dakota and has many important uses to the City. The coulee not only provides drainage and interior flood protection storage, but it also serves a pedestrian walking/biking corridor and provides recreation opportunities such […]
Bozeman Drought Resiliency Planning
DROUGHT RESILIENCY PLANNING Bozeman, Montana About the Project Situated near the headwaters of the Gallatin River watershed, the City of Bozeman has an advantageous location with respect to pristine water quality, but the City is extremely dependent on snowmelt runoff and adequate snowpack, along with natural and constructed reservoir storage, to provide an adequate supply […]
Great Falls Gore Hill Pump Station Electrical Improvements
GORE HILL PUMP STATION ELECTRICAL IMPROVEMENTS Great Falls, Montana About the Project The City of Great Fall enlisted AE2S to complete the final design of electrical improvements at the Gore Hill Pump Station. The pump station consists of three split-case horizontal booster pumps, ranging from 75-200 horsepower, with an approximate capacity of 4 million gallons […]
Great Falls WTP and Distribution System SCADA Improvements
GREAT FALLS WTP AND DISTRIBUTION SYSTEM SCADA IMPROVEMENTS Great Falls, Montana About the Project AE2S assisted the City of Great Falls with the development of a scheduled maintenance program for the WTP control system and its associated instrumentation and hardware. The City contracted AE2S to complete this preventative maintenance, as well as perform all on-call […]
Aurora North Campus Communication Study
NORTH CAMPUS COMMUNICATION STUDY Aurora, Colorado About the Project The City of Aurora selected AE2S to perform two separate, but interconnected studies. The first portion of the study evaluated the existing fiber optic line between the North Campus Server Room and South Campus Server Room. Project Details Date: 2021 – Present Client: City of Aurora […]
Grand Forks Water, Wastewater, and Stormwater SCADA
WATER, WASTEWATER, AND STORMWATER SCADA Grand Forks, North Dakota About the Project The AE2S Instrumentation and Controls (I&C) team has been providing General Services for the Utility System Controls on a case-by-case basis since 2002, working with the City to ensure that its control system performs as it should. Project Details Date: 2002 – Present […]
Minnetonka Ridgedale Booster Station Improvements
RIDGEDALE BOOSTER STATION IMPROVEMENTS Minnetonka, Minnesota About the Project The City of Minnetonka identified the need to rehabilitate the Ridgedale Booster Station and selected AE2S for the design, bidding, and construction phase services for the project. The booster station rehabilitation includes the removal and replacement of the entire existing electrical equipment, including electrical for three […]
Rapid City Dinosaur Park Accessibility Improvements
DINOSAUR PARK ACCESSIBILITY IMPROVEMENTS Rapid City, South Dakota About the Project Working as a subconsultant, AE2S was tasked with surveying, scanning, and performing ADA checks on the project to upgrade the local attraction that spans nearly 40 acres and hosts thousands of visitors every year. Project Details Date: 2021 Client: Tallgrass Landscape Architecture Key Project […]
Minnetonka Water Treatment Plant Electrical Upgrades
MINNETONKA WATER TREATMENT PLANT ELECTRICAL UPGRADES Minnetonka, Minnesota About the Project The City of Minnetonka has eight small water treatment plants (WTPs) which each consist of one remote submersible well, one vertical turbine well, two booster pumps, and two filters. The age of all electrical equipment within the WTPs was beyond its useful life, and […]
Fargo Water Treatment Plant Control System Upgrade
WATER TREATMENT PLANT CONTROL SYSTEM UPGRADE Fargo, North Dakota About the Project An Instrumentation and Control System Needs Assessment performed by AE2S showed that the Water Treatment Facility’s Supervisory Control and Data Acquisition (SCADA) System was outdated and out of support with no upgrade path. With no support options, the facility was at risk in […]