JVWCD Pump Station Electrical System
Pump Station Electrical System Jordan Valley, Utah About the Project AE2S completed the design for a new 51.7 MGD pump station to replace existing infrastructure and meet future projected demand. The new station runs in parallel with the existing facility, until the existing facility reaches the end of its useful life. The electrical system of […]
City of Larimore Street and Utility Improvements
CITYWIDE STREET AND UTILITY IMPROVEMENTS Larimore, North Dakota About the Project The City of Larimore had deferred maintenance on their street and utilities since they were constructed in the 1950s to 1970s. A master plan was developed in the late 1990s to rehabilitate the system over time, but no work was done. Project Details Date: […]
Grand Forks Regional Water Treatment Plant
GRAND FORKS REGIONAL WATER TREATMENT PLANT Grand Forks, North Dakota Challenges Necessitate New Regional Water Treatment Plant The new Grand Forks Regional Water Treatment Plant (GFRWTP) is a 20 million gallons per day hybrid water treatment facility that includes parallel conventional and membrane treatment processes that address key regulatory and water quality challenges, increased water […]
Bozeman Pear Street Booster Station Rehabilitation
Pear Street Booster Station Rehabilitation Bozeman, Montana The Need for the Project The City of Bozeman retained AE2S to rehabilitate the Pear Street booster station. The project allows the City to maximize its use of Lyman Spring water, which requires no treatment and flows by gravity into a portion of the distribution system. The project […]
Great Falls Water Treatment Plant Solids Mitigation
WATER TREATMENT PLANT SOLIDS MITIGATION Great Falls, Montana The Need for the Project The Great Falls WTP treats water from the Missouri River using a series of processes, including a traveling bar screen to remove large debris from the raw water intake stream and sedimentation/filtration, utilizing aluminum sulfate (alum) as the primary coagulant, to remove […]
Great Falls Water Treatment Plant Filter Improvements
WATER TREATMENT PLANT FILTER IMPROVEMENTS Great Falls, Montana About the Project The City of Great Falls, MT operates a conventional surface water treatment facility to treat water from the Missouri River. The conventional filtration process is comprised of four sections of filters, with original construction dates of 1916, 1932, 1952, and 1959. Each section consists […]
Great Falls Water Storage Assessment and Related Improvements
WATER STORAGE ASSESSMENT AND RELATED IMPROVEMENTS Great Falls, Montana About the Project The City of Great Falls maintains several water storage facilities located within its distribution system. In 2012, the City retained AE2S to conduct detailed assessments for five steel storage facilities. The Seasonal Clearwell at the Water Treatment Plant (WTP) site (2 million-gallon ground […]
Fargo Membrane Water Treatment Plant and Improvements Electrical Engineering
FARGO MEMBRANE WATER TREATMENT PLANT AND IMPROVEMENTS ELECTRICAL ENGINEERING Fargo, North Dakota About the Project The Fargo Water Treatment Plant uses membrane filtration and reverse osmosis to disinfect raw water prior to distribution. Reverse osmosis is an electrical energy intensive treatment technology and its implementation necessitated multiple electrical distribution system upgrades. Project Details Date: 2010 […]
Woodbury SCADA Design and Implementation
WOODBURY SCADA DESIGN AND IMPLEMENTATION Woodbury, Minnesota About the Project The City of Woodbury encountered major challenges with their SCADA system, drawing attention to the need for replacement. AE2S assisted with the design process and provided technical expertise and collaboration for the SCADA system design update. Project Details Date: 2017 – 2018 Client: City of […]
Grand Forks Regional Water Treatment Plant Electrical System
GRAND FORKS REGIONAL WATER TREATMENT PLANT ELECTRICAL SYSTEM Grand Forks, North Dakota About the Project The new Grand Forks Regional Water Treatment Plant (WTP) is capable of treating raw water from either of the City’s source waters with a treatment capacity between 16 and 20 million gallons per day (MGD). The WTP utilizes a combination […]