JVWCD Pump Station Electrical System
Pump Station Electrical System Jordan Valley, Utah About the Project AE2S completed the design for a new 51.7 MGD pump station to replace existing infrastructure and meet future projected demand. The new station runs in parallel with the existing facility, until the existing facility reaches the end of its useful life. The electrical system of […]
Fargo Membrane Water Treatment Plant and Improvements Electrical Engineering
FARGO MEMBRANE WATER TREATMENT PLANT AND IMPROVEMENTS ELECTRICAL ENGINEERING Fargo, North Dakota About the Project The Fargo Water Treatment Plant uses membrane filtration and reverse osmosis to disinfect raw water prior to distribution. Reverse osmosis is an electrical energy intensive treatment technology and its implementation necessitated multiple electrical distribution system upgrades. Project Details Date: 2010 […]
Grand Forks Regional Water Treatment Plant Electrical System
GRAND FORKS REGIONAL WATER TREATMENT PLANT ELECTRICAL SYSTEM Grand Forks, North Dakota About the Project The new Grand Forks Regional Water Treatment Plant (WTP) is capable of treating raw water from either of the City’s source waters with a treatment capacity between 16 and 20 million gallons per day (MGD). The WTP utilizes a combination […]