The City of Fargo made the decision to construct an Effluent Reuse Facility (ERF) that would treat effluent from the Wastewater Treatment Plant (WWTP) to provide water to the Tharaldson Ethanol Plant.
AE2S assisted with the special permitting requirements mandated by the North Dakota State Water Commission in an compressed accelerated time frame. In addition, based on the water quality requirements, AE2S recommended that multiple membrane technologies would be necessary. AE2S provided technical assistance in developing the project concept, detailed design review, and negotiating the procurement contracts for the membrane process equipment.