Aurora North Campus Communication Study
NORTH CAMPUS COMMUNICATION STUDY Aurora, Colorado About the Project The City of Aurora selected AE2S to perform two separate, but interconnected studies. The first portion of the study evaluated the existing fiber optic line between the North Campus Server Room and South Campus Server Room. Project Details Date: 2021 – Present Client: City of Aurora […]
OSRWSS Mni Wiconi WTP PLC Upgrades and SCADA Improvements
WTP PLC UPGRADES AND SCADA IMPROVEMENTS Ft. Pierre, South Dakota About the Project The Oglala Sioux Rural Water Supply System (OSRWSS) receives treated water from the Mni Wiconi Water Treatment Plant (WTP) in Ft. Pierre, SD. OSRWSS then distributes the treated drinking water to four different rural water systems. These include: The Oglala Sioux Rural […]
BDM Rural Water SCADA Upgrade
SCADA UPGRADE Britton, South Dakota About the Project BDM Rural Water knew that its SCADA system was outdated and needed improvements. To determine the best path forward, BDM selected AE2S to perform a SCADA System Needs Assessment to develop a plan for upgrading the SCADA system. Project Details Date: 2019 – 2020 Client: BDM Rural […]
Grand Forks Water, Wastewater, and Stormwater SCADA
WATER, WASTEWATER, AND STORMWATER SCADA Grand Forks, North Dakota About the Project The AE2S Instrumentation and Controls (I&C) team has been providing General Services for the Utility System Controls on a case-by-case basis since 2002, working with the City to ensure that its control system performs as it should. Project Details Date: 2002 – Present […]
Grand Forks UND School of Medicine and Health Sciences
UND SCHOOL OF MEDICINE AND HEALTH SCIENCES Grand Forks, North Dakota About the Project AE2S served as the civil engineer on the design team led by JLG Architects for a new School of Medicine and Health Sciences (SMHS) on the UND Campus. The new facility is prominently located on a seven-acre site at the corner […]
Minnetonka Ridgedale Booster Station Improvements
RIDGEDALE BOOSTER STATION IMPROVEMENTS Minnetonka, Minnesota About the Project The City of Minnetonka identified the need to rehabilitate the Ridgedale Booster Station and selected AE2S for the design, bidding, and construction phase services for the project. The booster station rehabilitation includes the removal and replacement of the entire existing electrical equipment, including electrical for three […]
Rapid City Dinosaur Park Accessibility Improvements
DINOSAUR PARK ACCESSIBILITY IMPROVEMENTS Rapid City, South Dakota About the Project Working as a subconsultant, AE2S was tasked with surveying, scanning, and performing ADA checks on the project to upgrade the local attraction that spans nearly 40 acres and hosts thousands of visitors every year. Project Details Date: 2021 Client: Tallgrass Landscape Architecture Key Project […]
Minnetonka Water Treatment Plant Electrical Upgrades
MINNETONKA WATER TREATMENT PLANT ELECTRICAL UPGRADES Minnetonka, Minnesota About the Project The City of Minnetonka has eight small water treatment plants (WTPs) which each consist of one remote submersible well, one vertical turbine well, two booster pumps, and two filters. The age of all electrical equipment within the WTPs was beyond its useful life, and […]
Fargo Water Treatment Plant Control System Upgrade
WATER TREATMENT PLANT CONTROL SYSTEM UPGRADE Fargo, North Dakota About the Project An Instrumentation and Control System Needs Assessment performed by AE2S showed that the Water Treatment Facility’s Supervisory Control and Data Acquisition (SCADA) System was outdated and out of support with no upgrade path. With no support options, the facility was at risk in […]
Fargo Red River Pump Station 3D Scanning
RED RIVER PUMP STATION 3D SCANNING Fargo, North Dakota About the Project The City of Fargo’s Red River Pump Station serves as the primary pumping facility to supply source water to its 45 million gallon per day (MGD) Water Treatment Plant (WTP). To accommodate the increased demands brought on by the addition of West Fargo […]