AE2S is Advanced Engineering and Environmental Services

Grand Forks Regional Water Treatment Plant Electrical System

Grand Forks Regional Water Treatment Plant Electrical System

GRAND FORKS REGIONAL WATER TREATMENT PLANT ELECTRICAL SYSTEM Grand Forks, North Dakota About the Project The new Grand Forks Regional Water Treatment Plant (WTP) is capable of treating raw water from either of the City’s source waters with a treatment capacity between 16 and 20 million gallons per day (MGD). The WTP utilizes a combination […]

Traill County Economic Development Commission

Traill County Economic Development Commission

TRAILL COUNTY ECONOMIC DEVELOPMENT COMMISSION Traill County, North Dakota About the Project AE2S Communications worked with the Traill County Economic Development Commission to create strategy and messaging to support the “Come Home to Traill” tagline. The goal of this initiative is to attract workforce, businesses, and developers to the community. Project Details Client: Traill County […]

Great Falls Storm Drain Design Manual

Great Falls stormwater drain design manual

STORM DRAIN POLICY UPDATES AND DRAIN DESIGN MANUAL Great Falls, Montana Project Description The City of Great Falls needed to develop new stormwater policies and update their Storm Drain Design Manual (SDDM). The project involved three main segments: a new Regional Treatment Facility (RTF) funding policy and tracking tool; a new contractor erosion control training […]

Grand Forks English Coulee Water Quality Improvement and Public Outreach

English Coulee Water Quality Improvement and Public Outreach

ENGLISH COULEE WATER IMPROVEMENT AND PUBLIC OUTREACH Grand Forks, North Dakota About the Project The English Coulee meanders through Grand Forks, North Dakota and has many important uses to the City. The coulee not only provides drainage and interior flood protection storage, but it also serves a pedestrian walking/biking corridor and provides recreation opportunities such […]

North Dakota DWR Strategic Governance and Finance Study

Strategic Governance and Finance Study

STRATEGIC GOVERNANCE AND FINANCE STUDY North Dakota Regional Water Systems About the Project The North Dakota Department of Water Resources (DWR) selected AE2S to conduct a comprehensive study of Strategic Governance and Finance of the four main regional water systems in North Dakota. Project Details Date: 2020 – 2021 Client: North Dakota Department of Water […]

Western Area Water Supply Authority Missouri River Bathymetric Survey

Missouri River Bathymetric Survey

MISSOURI RIVER BATHYMETRIC SURVEY Williston, North Dakota About the Project Closure of Garrison Dam in the mid 20th century reduced flow velocities in the areas upstream of the dam, which has induced significant sediment deposition, most notably in the vicinity of Williston, North Dakota. The City of Williston, in conjunction with the Western Area Water […]

Bozeman Drought Resiliency Planning

Bozeman Drought Resiliency Planning

DROUGHT RESILIENCY PLANNING Bozeman, Montana About the Project Situated near the headwaters of the Gallatin River watershed, the City of Bozeman has an advantageous location with respect to pristine water quality, but the City is extremely dependent on snowmelt runoff and adequate snowpack, along with natural and constructed reservoir storage, to provide an adequate supply […]

Great Falls Gore Hill Pump Station Electrical Improvements

Great Falls Gore Hill Pump Station Electrical Improvements

GORE HILL PUMP STATION ELECTRICAL IMPROVEMENTS Great Falls, Montana About the Project The City of Great Fall enlisted AE2S to complete the final design of electrical improvements at the Gore Hill Pump Station. The pump station consists of three split-case horizontal booster pumps, ranging from 75-200 horsepower, with an approximate capacity of 4 million gallons […]

Great Falls WTP and Distribution System SCADA Improvements

WTP and Distribution System SCADA Improvements

GREAT FALLS WTP AND DISTRIBUTION SYSTEM SCADA IMPROVEMENTS Great Falls, Montana About the Project AE2S assisted the City of Great Falls with the development of a scheduled maintenance program for the WTP control system and its associated instrumentation and hardware. The City contracted AE2S to complete this preventative maintenance, as well as perform all on-call […]

Rocky Boy’s/North Central Montana Regional Water System SCADA Services

Rocky Boy's/North Central Montana Regional Water System SCADA Services

SCADA SERVICES North Central Montana About the Project The Rocky Boy’s/North Central Montana Regional Water System (RB/NCMRWS) Project is intended to address the water quantity and quality challenges of the Rocky Boy’s Reservation and numerous off-reservation communities, water districts, and other water utilities represented by the North Central Montana Regional Water Authority (NCMRWA). Project Details […]