DEADWOOD WELCOME CENTER

Deadwood, South Dakota

Our Services

AE2S provided civil design and surveying services for construction of a new Welcome Center and parking lot on the existing site located on the east side of Lower Main Street in Deadwood, South Dakota.

Project Details

Date: 2015 – 2017

Client: Chamberlin Architects

Key Project Elements
  • Parking and Access Maintenance
  • Pedestrian Walkway
  • ADA Accessibility
  • Drainage

Two-Phased Approach

The project was completed in two phases: The South Phase consisted of the demolition of the southern portion of the parking lot and all civil related work encompassing the Welcome Center, including transit access, parking, pedestrian access, retaining structures, building utilities, etc.

The North Phase consisted of demolition of the existing Visitor Center and the remaining portion of the parking lot and the construction of a new parking lot with improved pedestrian access, drainage, new pedestrian path, and a more effective parking layout.

Additions to the parking lot include pedestrian walkways, a signalized pedestrian crossing, removable railings for snow removal, as well as the pedestrian bridge near the proposed Welcome Center. The Bike Path improvements consisted of removal and replacement of the asphalt walkway along with a two-foot Type C retaining wall.