Stark County Courthouse

STARK COUNTY COURTHOUSE Dickinson, North Dakota Project Details Date: 2016 – 2018Client: JLG Architects Courthouse Addition The Stark County Courthouse Addition is constructed directly adjacent to the existing 1930s courthouse building and connected with a multi-level connecting link hallway. The addition provides approximately 16,300 square feet of new space, is three stories in height, and […]
Grand Forks Regional WTP Structural Engineering

GRAND FORKS REGIONAL WTP STRUCTURAL ENGINEERING Grand Forks, North Dakota Project Details Date: 2015 – 2020Client: City of Grand Forks The Need for a New Regional Water Treatment Plant The Grand Forks Regional Water Treatment Plant (GFRWTP) is a 20 million gallons per day hybrid water treatment facility that includes a parallel conventional and membrane […]
Williston Public Works Facility

WILLISTON PUBLIC WORKS FACILITY Williston, North Dakota About the Project The rapid growth resulting from the Bakken shale oil play caused Williston to look at construction of a new public works facility. AE2S assisted the City with selection of an architect and a construction manager at-risk for the project. Once an architect was selected, AE2S […]
Basin Electric Laramie River Station Dust Collector Project

LARAMIE RIVER STATION DUST COLLECTOR PROJECT Laramie, Wyoming About the Project Basin Electric Power Cooperative generates power for rural electric cooperatives throughout the mid-west. Part of their generation capacity includes coal fired power plants. Basin Electric owns a controlling interest and operates the Laramie River Station in Wheatland, WY. The power plant is required to […]
Williston Public Schools Innovation Academy

WILLISTON PUBLIC SCHOOLS INNOVATION ACADEMY Williston, North Dakota AE2S was retained to provide structural engineering to renovate Hagan Aquatics Center, a two-basin pool facility and attached one-story administrative and commons area, into a multi-section Grade 5-8 academy. Project Details Date: 2019 – 2020 Client: JLG Architects Key Project Elements Extensive Renovation to Turn Aquatics Center […]
International Peace Garden Campus-wide Building Condition Assessments

INTERNATIONAL PEACE GARDEN CAMPUSWIDE BUILDING CONDITION ASSESSMENT Dunseith, North Dakota Project Details Date: 2021 – 2023Client: International Peace Garden Building Condition Assessment The International Peace Garden has embarked on an extensive initiative comprising studies and projects with the objective of preserving and enhancing its existing facilities while introducing new elements to this iconic site. Situated […]
Weber West Pump Station Utah

WEBER WEST PUMP STATION West Haven City, Utah Project Details Date: 2021 – 2023Client: Weber Basin Water Conservancy District Accelerated Schedule for New Pump Station Rapid growth accompanied by a sudden increase in industrial water usage created the need for increased flow capacity in western Weber County. Weber Basin Water Conservancy District partnered with AE2S […]
UND Steam Plant

UND STEAM PLANT Grand Forks, North Dakota Project Details Date: 2018 – 2020Client: Johnson Controls Structural and Civil Engineering Services for Steam Generating Plant AE2S was retained to provide structural and civil engineering services for the construction of a 300,000 #/hour, 16,200 GSF multi-story steam generating plant that replaced the aging coal-fired steam generating plant. […]
Grand Forks Cities Area Transit Bus Facility

CITIES AREA TRANSIT BUS FACILITY Grand Forks, North Dakota About the Project The City of Grand Forks was looking for a comprehensive reimagining of the existing Cities Area Transit (CAT) bus facility and turned to the team led by JLG Architects, with AE2S serving as a subconsultant. The project included complete demolition of the one-story/low-roof […]