Pear Street Booster Station Rehabilitation
Bozeman, Montana
The Need for the Project
The City of Bozeman retained AE2S to rehabilitate the Pear Street booster station. The project allows the City to maximize its use of Lyman Spring water, which requires no treatment and flows by gravity into a portion of the distribution system. The project includes distribution system modeling, pump sizing and replacement, piping selection, and pressure control valves that connect the City’s two largest pressure zones. Electrical, instrumentation and controls, and SCADA upgrades, as well as structural facility upgrades are also included.
Project Details
Date: 2018 – 2020
Client: City of Bozeman
Key Project Elements
- Facility Optimization
- Construction Services
- Instrumentation & Controls